Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Server Website Home
Recent changes
Random page
Help about MediaWiki
New Territories
Search
Search
Appearance
Create account
Log in
Personal tools
Not logged in
Talk
Contributions
Create account
Log in
Editing
East Regional
(section)
Page
Discussion
English
Read
Edit
Edit source
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
Edit source
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== ''East Local Regional'' Expansion (2021-2026) === On July 9th, 2021, Ashwood Southeastern announced that they would be double tracking the line between Ashwood and Sterry to allow for more frequent service on the ''East Local Regional'' and to allow less delays between passenger trains and freight trains that used the same route. Part of the plan was to finally move all main rail traffic away from Sierra Pass and on to the Sierra Cutoff. A new stop in [[Sterry Valley]], a town between Brook and Sterry, was also proposed but has yet to get the green light to begin construction. Work on double tracking and rebuilding parts of the right of way began in fall 2021. The biggest challenge was double tracking and regrading the line between Ashwood and the railroad location Cutoff Junction. The whole right of way had to be basically entirely rebuilt. Work on that part was completed in 2025. The old route over Sierra Pass between Big Ten and Sierra (Sterry Valley) was leased to the [[Sierra Valley Railroad]]. The new double track on the entire line save for a small part in Sterry was completed in early 2026. A new [[Deadwood Transit Center|transit center]] in Deadwood was completed by 2023, featuring several new bus platforms, two track platforms, a new plaza mall and a connection to [[Copper Mountain Transit Authority|CMTA]]βs subway service.
Summary:
Please note that all contributions to New Territories may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
New Territories:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
East Regional
(section)
Add topic